Sunday, November 22, 2015

Step by step: How we built our bowl


So far, every build of this project has been an adaptation of the existing landscape. We were inspired by how this pre-existing egg-shaped grass pad was a great shape for a bowl. The existing curb also provided a great structural foundation.

Step one: digging
We called 1-800-DIG-RITE to make sure it was safe to dig. Digging started with shovels and went that way for about a month until our friend Louis offered to come help out with a Bob Cat. He works for a neighborhood company who's owner really likes what we're doing. He donated the equipment and Louis donated his time. We just provided $20 for gas. The Bob Cat was able to get out most the dirt but not everything, so we still had a ton of digging to do by hand. It would have been better to have just rented a mini excavator in the beginning and knocked it all out in one day, but we didn't have any money yet and were happy to have the help.

Louis wiggled into the hole we had already made and then dug himself out.



Step two: forms and rebar

We figured out what radius curves we would need to match the existing shape, then drew them on the plywood, cut them out, and used Tapcon screws to attach the forms to the curb. We also drilled into the curb and hammered in anchors that we could wire rebar to.

Here's a section with rebar attached, death box form, and transition form. 

When we made our transition forms, we added 4" of flat onto the bottom of each form. That helps maintain a consistent transition from the flat areas to the transition areas, instead of having a little kink at the bottom.

^ The hole in the picture above is a 'soak away pit' or 'drain box'. The hole is so that water can collect under the bowl instead of in it. We lined the hole with landscaping fabric so that dirt wouldn't get in, then placed a pipe with holes drilled in it down to the bottom that was tall enough to reach the surface of the bowl. Then we filled in the hole with gravel. If it rains heavily, the water comes up into the bowl, but for light to moderate rain it works pretty well.

The transition forms went in next. The forms were made 2" thick so they would sit on top of the rebar so we could pull them while working with the concrete. We cut 2' stakes to hold these in place. One at the bottom, one in the middle, and secured the top to the top form.

For the bottom forms we used 'flexboard' for the curves and that worked really well. We used 2x4's for the straight sections. We used stakes to keep it in place and screwed the bottom of the transition forms to the bottom forms.

Rebar is tied every foot, vertically and horizontally. We used 3/8th" rebar because it is easier to bend by hand. Holes are drilled 2" down in the bottom form to slip the rebar through. Now we are ready for our first pour!



Step three: make tools

Because the bowl curves both vertically and horizontally, we needed some curved tools. Since we were doing a 3' radius transition in the shallow end, we made tools that were curved to that same radius curve. We bought bulk resin float material from Kraft Tool in Olathe. We cut the resin material to the right length, cut handles out of 2x4's to fit the curve, and then screwed the resin to the handle after heating it up at the oven at 400 degrees. Pre drill and countersink holes in the resin.

We also made these magnesium floats into radius trowels. Kyle was able to use a bearing press at his work to bend the trowel into the curve we needed. Another way to do it is to take the handle off, go to an existing concrete ramp with the same curve you want, heat up the trowel with a torch, and hammer the trowel against the ramp.

Step four: concrete (finally!)

At this point we were tired of hand mixing everything by hand, but not ready to order a whole truck, so we tried getting these premixed 1-yard carts of concrete that you just tow to your site. It's been a learning process of how to ask these guys to mix the concrete. We've found that if we ask for a mix for curbs it is pretty close to what we want, which is a sort of a thick mud consistency; not watery. The problem with the yard cards is that you have to have someone making multiple trips to get each load instead of it all showing up with one truck.

We tried to evenly shovel the concrete into our forms, and then used a negative radius form to shape the concrete into the radius we wanted. Once the concrete was shaped to how we wanted we pulled out out temporary transition forms and filled in the holes where they were. The concrete was worked with our resin trowels to continue shaping the concrete until all the lumps were out. Then the magnesium float trowels were used to start sealing the concrete and bringing the cream to the top. Lastly, steel finishing trowels were used to achieve a smooth surface.

We didn't have the experience to pour the whole bowl at once, so we did the shallow end first. When it was time to make the deep end, we made new radius trowels to fit the deep end, which had a 5ft radius. 

Next, we poured the deep end of the bowl in about the same way as the shallow. The deep end had much more surface area to work, making it much harder for us. We strategically did this after the shallow so we could work on our techniques on an easier section. We had a lot of people come out this day, and we ran into an annoying snag when the concrete truck showed up 3 hours late. We lost a lot of our helpers by the time the truck finally showed up. We were also trying to beat the heat by starting early. It got up to about 100 degrees that day and we were working the concrete until the evening.


Next was the flat of the bowl, which was not too difficult after what we had already done. We bought a cast iron floor drain from an Ace Hardware. We used a level to make sure the top of the drain was just below the deep end flat, so that the water wouldn't pool anywhere else. Once we had it in the right place we just duct taped it in place and shoveled the concrete around it.

Step five: coping

Because our fellow skateboarders had been so supportive of this project, we were able to purchase pool coping from Tedderstone, who makes coping specifically for skate parks. The cheaper DIY way to do this is build your own pool coping molds or you can free hand all the coping. The Tedderstone coping has a great shape and is very smooth, so we were happy to have it on our bowl. We installed the coping using mortar mix. We mixed the mortar, laid a 'bed' of it down about 2 inches thick, placed the coping down, wiggled it and tapped it with a rubber mallet to set it in place. We took the excess mortar and rubbed it into the cracks in between the coping pieces. We also used a level to make sure the coping was all even.

The last step for the coping was to scrape out the mortar in the seam in between each coping block, right where it's going to be grinded. We filled in those seams with a concrete bonding epoxy. This epoxy won't chip out, like the mortar will, so the coping stays in good shape.

The final step we did was to seal the concrete with a Deep Penetrating Sealer made by Evercrete. It was recommended to us by some skate park builders. This helps weather seal the concrete, which makes a big difference in our frigid midwest winters.

And it is done!

We started digging our hole in late March, and the bowl was finally skateable almost 4 months later in early July. It was a slow process, starting with shovels and volunteers who were just figuring it out as we went. This was a huge learning process project for us, and prepared us to start expanding the park around the bowl. 

We can't say thank you enough to the huge community effort that made this project happen. Countless volunteer hours were logged by what seemed like at least a hundred different people. Local businesses donated gift certificates and venues donated their spaces for fundraisers. People we'd never met before brought us tools, materials, and cash donations. PBR's local marketing guy hooked us up with a $2,000 donation. We were fortunate enough to win our first grant from the Charlotte Street Foundation, which helped us finish off the very last parts of the bowl and also gave us a huge kickstart to keep the project rolling and begin expanding around the bowl. 

Thank you, thank you, thank you to everyone that chipped into this wild idea! It wouldn't have been possible without so many of a friends and other great people of Kansas City that we didn't even know were paying attention.

18 comments:

  1. My wife and I are trying to figure out whether to do a concrete patio under or wood deck around our new hot tub. If we wind up doing a wooden deck it will be raised almost as high as the hot tub.

    Either way, which do you think would be better. More functional? Safer? Longer lasting?

    The hot tub is a good 15 feet from our home and will be covered with a sun room type shelter with removable windows. It's beautiful!

    Also, what products would you refer to use? As in, types of wood, etc. We want to do this home project right! ..And while he's doing his own research online, I've turned to Yahoo! ;D

    Thanks, everyone!!!

    wood flooring

    ReplyDelete
  2. Hey there, first of all thank you so much for this post and honestly I was searching for the same information from last few days. Keep posting and keep sharing.
    tow truck kansas city mo

    ReplyDelete
  3. the curved transition board stay in or do you remove them or something?

    ReplyDelete
    Replies
    1. As you can see in the photos, the bowl was poured in sections. So, some of the transition forms stayed in and created the boundaries of the individual pours. The transition forms that were in the middle of the section being poured were used as guides to get the concrete into the correct shape. Once the concrete was shaped correctly, those forms were pulled out and the holes were filled in with concrete. Does that make sense?

      Delete
  4. I have read some of your blogs and I found all of them very much expressive and easy to understand. Some people have it very clear in their mind that how to express the ideas and views. I think you are one of them. Thank you for this.
    Crushed Gravel Supplier

    ReplyDelete
  5. An amazing article. It’s nice to read a quality blog post. I think you made some good points in this post.Because we are using for easily to Concrete repair mix & also benefits of reliable cost.
    Waterproof mortar.

    ReplyDelete
  6. Get Pool coping for beautification as for functionality and can be a necessary and attractive feature to add in your swimming pool.Pool Coping

    ReplyDelete
  7. Good post. I like the way you thought and share your experience.
    shouldersback posture brace

    ReplyDelete
  8. its great how you guys did that. Looking at the initial pictures i thought you guys were building out a pool, but still turned out to be good.

    ReplyDelete
  9. Simply wish to say your article is as astonishing. The clarity in your post is simply great, and I could assume you are an expert on this subject. Same as your blog i found another one Sohman Epoxy .Actually I was looking for the same information on internet for
    Brown 287
    and came across your blog. I am impressed by the information that you have on this blog. Thanks a million and please keep up the gratifying work.

    ReplyDelete
  10. Your articles are quite beneficial to me. It is simple to comprehend and instructive. Also, I'd like to recommend a shader pack for Minecraft. You can get the BSL Shaders ​set here, and I'm sure you'll enjoy it.

    ReplyDelete
  11. ทดลองเล่น pg slot หากิจกรรมยามว่างฆ่าเวลาเเถมยังได้เงินต้องทดลองเล่น พีจีสล็อต เกมคาสิโนออนไลน์สะดวกสุดๆ เล่นที่ไหนก็ได้ 24ชม.โบนัสเเตกง่าย รับเงินไปเลยฝาก-ถอนง่ายเเละไว

    ReplyDelete
  12. ฝาก20รับ100 pg ล่าสุด การฝากถอนในเกมสล็อต PG SLOT เป็นกระบวนการที่ง่ายสะดวกสบายทำให้ผู้เล่นสามารถเข้ามาเล่นเกมได้โดยไม่มีความยุ่งยากมากมาย นี้คือขั้นตอนที่ทำให้การฝากถอนใน PG Slot

    ReplyDelete
  13. I’m going to be building a bowl at my new house next month and doing the same kind of drain, do you think it’s necessary or could benefit if I had another pipe going horizontally away from the main drain carrying the water away from under the bowl at a slant to another rock pit just outside the concrete zone, deeper ofcourse.

    ReplyDelete
    Replies
    1. Did you end up building your bowl? I think it really just depends on your soil and situation. For us, it would have been better to have a horizontal pipe take the water somewhere else to drain, but this is what our budget allowed. It kind of works. We also have a very high clay content soil, so it just doesn't drain that well. Places with soils that will percolate will let the water be absorbed into the ground better and would work.

      Delete